Bridging The Swarm (NeonSat-1A)
Electron, Rocket Lab
Rocket Lab Launch Complex 1A, Rocket Lab Launch Complex 1, Mahia Peninsula, New Zealand
Launch time
T-0
Fri 30 Jan, 02:21:39 CET
01:21:39 UTC
The rocket put its payload into the planned orbit.
- Window opens
- Window closes
How sure is this date?
The source gives second precision. Launch plans can change.
Launch probability 100%
Launch record updated by LL2
Feed checkedMission
Bridging The Swarm (NeonSat-1A) on Electron. Fri 30 Jan 2026, 01:21:39 UTC. Reported outcome: Success. Launch site: Rocket Lab Launch Complex 1A. Source: Launch Library 2.
The NeonSat-1A, carrying a high-resolution optical camera, is designed to test the constellation capabilities of the South Korean government's Earth observation micro-satellite constellation NeonSat (New-space Earth Observation Satellite), in particular technology improvements identified from operations of NeonSat-1 after its launch in April 2024. These technologies will in turn be incorporated into the next 10 NeonSat under construction, as well as providing more site re-visiting capabilities along with NeonSat-1. The NeonSat constellation is the first satellite system developed by the government using a mass-production approach for precise monitoring of the Korean Peninsula, lead by the Satellite Technology Research Center (SaTReC) at the Korea Advanced Institute of Science and Technology (KAIST), Korea’s leading university dedicated to science and technology. Designed to capture near-real time natural disaster monitoring for the Korean peninsula, KAIST’s NEONSAT constellation is a collaboration across multiple Korean academic, industry, and research institutions, including SaTReC, which is leading the program’s system design and engineering. The NEONSAT program is funded by the Korean government’s Ministry of Science and ICT (MSIT).
- Mission type
- Earth Science
- Orbit
- Sun-Synchronous Orbit

Mission patches
- Bridging The Swarm Patch
Patch artwork is not shown because its image licence is unconfirmed.
Launch timeline
Times are relative to liftoff.
- T-2 min
Startup
The onboard computer takes control over the countdown and runs last checks
- T-2 s
Ignition
Start of the engine ignition sequence
- T-0
Liftoff
First upwards movement of the rocket
- T+56 s
Supersonic
Vehicle is supersonic
- T+1 min 7 s
Max-Q
Maximum dynamic pressure
- T+2 min 37 s
MECO
Cut-off of the main engine
- T+2 min 40 s
Stage 2 Separation
Separation of the second stage from the first
- T+2 min 43 s
SES
Start of the second engine
- T+3 min 41 s
Fairing Separation
Separation of the payload fairing
- T+6 min 35 s
Battery Hotswap
Electron Second stages switches to a new set of batteries and jettisons the depleted ones.
- T+9 min 7 s
SECO
Cut-off of the second engine
- T+9 min 11 s
Kick Stage Separation
Separation of the kick stage from the previous stage
- T+51 min 13 s
Kick Stage Ignition
Start of the kick stage engine
- T+53 min 8 s
Kick Stage Cut-off
Cut-off of the kick stage engine
- T+53 min 58 s
Payload Separation
Final deployment of the payload from the rocket
Slip history
Changes recorded by Space Right Now
No changes since we started tracking on .
Source updates from Launch Library 2 (26)
Announcements supplied by LL2 may predate our tracking. They are separate from changes observed by Space Right Now.
- LL2 update
Launch success.
Read the source update - LL2 update
Spacecraft separation.
Read the source update - LL2 update
Official Webcast by Rocket Lab has started
Read the source update - LL2 update
Liftoff.
Read the source update - LL2 update
New T-0.
Read the source update - LL2 update
Hold at T-08:59.
Read the source update - LL2 update
Updated launch weather, 70% GO.
Read the source update - LL2 update
GO for launch.
Read the source update - LL2 update
Delayed to NET January 30.
Read the source update - LL2 update
NET January 28 UTC, to be confirmed as for this launch.
Read the source update - LL2 update
NET January 27 LT per new navigation warnings, to be confirmed.
Read the source update - LL2 update
No more Rocket Lab launches in 2025.
Read the source update - LL2 update
Reverted back to NET December TBD.
Read the source update - LL2 update
Scrubbed for the day.
Read the source update - LL2 update
Abort at engine ignition.
Read the source update - LL2 update
Official Webcast by Rocket Lab has started
Read the source update - LL2 update
Rescheduled for December 16 UTC.
Read the source update - LL2 update
Reverted back to December TBD pending new launch date.
Read the source update - LL2 update
Scrubbed for the day.
Read the source update - LL2 update
Recycled for end of window.
Read the source update - LL2 update
Hold at T-5:43.
Read the source update - LL2 update
Official Webcast by Rocket Lab has started
Read the source update - LL2 update
Updated T-0.
Read the source update - LL2 update
GO for launch.
Read the source update - LL2 update
Updated launch window per new NOTAMs.
Read the source update - LL2 update
Added launch.
Read the source update
Launch pad
Rocket Lab Launch Complex 1A
Rocket Lab Launch Complex 1, Mahia Peninsula, New Zealand (NZ)
Coordinates: -39.262833, 177.864469
View launch pad on a map