Skip to content
Space Right Now

Blue Ghost Lunar Lander Mission 1 & Hakuto-R M2 “Resilience”

Falcon 9 Block 5, SpaceX

Launch Complex 39A, Kennedy Space Center, FL, USA

Launch time

T-0

Wed 15 Jan, 07:11:39 CET

06:11:39 UTC

The rocket put its payload into the planned orbit.

Window opens
Window closes

How sure is this date?

The source gives second precision. Launch plans can change.

Launch probability 90%

Weather concerns: Liftoff Winds, Cumulus Cloud Rule

Launch record updated by LL2

Feed checked
Add to calendar

Mission

Blue Ghost Lunar Lander Mission 1 & Hakuto-R M2 “Resilience” on Falcon 9 Block 5. Wed 15 Jan 2025, 06:11:39 UTC. Reported outcome: Success. Launch site: Launch Complex 39A. Source: Launch Library 2.

Blue Ghost is a commercial lunar lander developed by Firefly Aerospace for NASA’s CLPS program. Blue Ghost is designed to bring up to 155kg of payload to the lunar surface. It will land at Mare Crisium in the Crisium Basin and is designed to last 14 days before freezing in the lunar night. Resilience is the second mission of the Hakuto-R commercial lunar lander developed by private Japanese company ispace. The lander will carry a small rover developed by ispace to perform studies on the moon's surface. The rover is also expected to collect lunar regolith as part of a contract with NASA signed in 2020, in which companies will collect materials on the moon and then transfer ownership "in situ" to the agency.

Mission type
Lunar Exploration
Orbit
Lunar Orbit
Falcon 9 liftoff from LC-39A
Credit: SpaceX · CC BY-NC 2.0

Mission patches

  • Blue Ghost M1 & Hakuto-R M2

Patch artwork is not shown because its image licence is unconfirmed.

Launch timeline

Times are relative to liftoff.

  1. T-38 min

    GO for Prop Load

    Launch director verifies go for propellant load

  2. T-35 min

    Prop Load

    Start of propelland loading

  3. T-35 min

    Stage 1 LOX Load

    Start of liquid oxygen loading in the first stage

  4. T-16 min

    Stage 2 LOX Load

    Start of liquid oxygen loading in the second stage

  5. T-7 min

    Engine Chill

    Start of engine chilling

  6. T-1 min

    Startup

    The onboard computer takes control over the countdown and runs last checks

  7. T-1 min

    Tank Press

    Fuel tanks are pressurized to flight levels

  8. T-45 s

    GO for Launch

    Launch director verifies go for launch

  9. T-3 s

    Ignition

    Start of the engine ignition sequence

  10. T-0

    Liftoff

    First upwards movement of the rocket

  11. T+1 min 12 s

    Max-Q

    Maximum dynamic pressure

  12. T+2 min 28 s

    MECO

    Cut-off of the main engine

  13. T+2 min 31 s

    Stage 2 Separation

    Separation of the second stage from the first

  14. T+2 min 38 s

    SES-1

    First start of the second engine

  15. T+3 min 28 s

    Fairing Separation

    Separation of the payload fairing

  16. T+6 min 4 s

    Entry Burn Startup

    Start of the atmospheric entry burn

  17. T+6 min 30 s

    Entry Burn Shutdown

    End of the atmospheric entry burn

  18. T+7 min 49 s

    SECO-1

    First cut-off of the second engine

  19. T+7 min 58 s

    Stage 1 Landing Burn

    Start of the first stage landing burn

  20. T+8 min 20 s

    Stage 1 Landing

    Landing of the first stage

  21. T+58 min 24 s

    SES-2

    Second start of the second engine

  22. T+59 min 25 s

    SECO-2

    Second cut-off of the second engine

  23. T+1 h 5 min 36 s

    Payload Separation

    Final deployment of the payload from the rocket

  24. T+1 h 26 min 15 s

    SES-3

    Third start of the second engine

  25. T+1 h 26 min 16 s

    SECO-3

    Third cut-off of the second engine

  26. T+1 h 32 min 42 s

    Payload Separation

    Final deployment of the payload from the rocket

Slip history

Changes recorded by Space Right Now

No changes since we started tracking on .

    Source updates from Launch Library 2 (12)

    Announcements supplied by LL2 may predate our tracking. They are separate from changes observed by Space Right Now.

    1. LL2 update

      Both lunar landers now in contact.

      Read the source update
    2. LL2 update

      Both Payloads deployed

      Read the source update
    3. LL2 update

      Liftoff

      Read the source update
    4. LL2 update

      Tweaked T-0.

      Read the source update
    5. LL2 update

      Weather is 90% favorable for launch.

      Read the source update
    6. LL2 update

      Tweaked T-0.

      Read the source update
    7. LL2 update

      GO for launch.

      Read the source update
    8. LL2 update

      NET January 15.

      Read the source update
    9. LL2 update

      Updated entry with Blue Ghost Mission 1 & HAKUTO-R M2 confirmed to be launching on the same rocket.

      Read the source update
    10. LL2 update

      NET January.

      Read the source update
    11. LL2 update

      NET Fall 2024.

      Read the source update
    12. LL2 update

      NET May 2024

      Read the source update

    Launch pad

    Launch Complex 39A

    Kennedy Space Center, FL, USA (US)

    Coordinates: 28.60822681, -80.60428186

    View launch pad on a map
    Launch data: The Space Devs (Launch Library 2)

    Launch plans change. Times are estimates from the source, not a guarantee of liftoff.