Dror-1
Falcon 9 Block 5, SpaceX
Space Launch Complex 40, Cape Canaveral SFS, FL, USA
Launch time
Window opens
Sun 13 Jul, 07:04 CEST
05:04 UTC
The rocket put its payload into the planned orbit.
- Window closes
How sure is this date?
The source gives minute precision. Launch plans can change.
Launch probability 80%
Weather concerns: Cumulus Cloud Rule, Anvil Cloud Rules
Launch record updated by LL2
Feed checkedMission
Dror-1 on Falcon 9 Block 5. Sun 13 Jul 2025, 05:04 UTC. Reported outcome: Success. Launch site: Space Launch Complex 40. Source: Launch Library 2.
Note: SpaceX identifies the mission as "Commercial GTO 1". Dror-1 is a geostationary communication satellite built and developed by Israel Aerospace Industries (IAI). It is intended to meet the satellite communication needs of Israel for the next 15 years. Dror-1 is comprised primarily of local Israeli technologies developed at IAI, including an advanced digital communication payload and “smartphone in space” capabilities, to provide communication agility throughout the satellite’s lifetime in space.
- Mission type
- Communications
- Orbit
- Geostationary Transfer Orbit

Mission patches
- Dror-1
Patch artwork is not shown because its image licence is unconfirmed.
Launch timeline
Times are relative to liftoff. Clock times are not shown while T-0 is unconfirmed or on hold.
- T-38 min
GO for Prop Load
Launch director verifies go for propellant load
- T-35 min
Prop Load
Start of propelland loading
- T-35 min
Stage 1 LOX Load
Start of liquid oxygen loading in the first stage
- T-16 min
Stage 2 LOX Load
Start of liquid oxygen loading in the second stage
- T-7 min
Engine Chill
Start of engine chilling
- T-1 min
Startup
The onboard computer takes control over the countdown and runs last checks
- T-1 min
Tank Press
Fuel tanks are pressurized to flight levels
- T-45 s
GO for Launch
Launch director verifies go for launch
- T-3 s
Ignition
Start of the engine ignition sequence
- T-0
Liftoff
First upwards movement of the rocket
- T+1 min 10 s
Max-Q
Maximum dynamic pressure
- T+2 min 28 s
MECO
Cut-off of the main engine
- T+2 min 32 s
Stage 2 Separation
Separation of the second stage from the first
- T+2 min 39 s
SES-1
First start of the second engine
- T+3 min 24 s
Fairing Separation
Separation of the payload fairing
- T+6 min 14 s
Entry Burn Startup
Start of the atmospheric entry burn
- T+6 min 37 s
Entry Burn Shutdown
End of the atmospheric entry burn
- T+8 min 4 s
Stage 1 Landing Burn
Start of the first stage landing burn
- T+8 min 27 s
Stage 1 Landing
Landing of the first stage
Slip history
Changes recorded by Space Right Now
No changes since we started tracking on .
Source updates from Launch Library 2 (5)
Announcements supplied by LL2 may predate our tracking. They are separate from changes observed by Space Right Now.
- LL2 update
Launch success.
Read the source update - LL2 update
Liftoff.
Read the source update - LL2 update
GO for launch.
Read the source update - LL2 update
Weather is 80% favorable for launch.
Read the source update - LL2 update
Added launch; payload identity to be confirmed.
Read the source update
Launch pad
Space Launch Complex 40
Cape Canaveral SFS, FL, USA (US)
Coordinates: 28.56194122, -80.57735736
View launch pad on a map