
File imagery: Crew-9, 28 September 2024. Falcon 9 lifting off from Space Launch Complex 40.
Credit: NASA/Keegan Barber · Public domain (NASA) · SourceIMAP & others
Falcon 9 Block 5, SpaceX
T-0
Wed 24 Sept 2025, 13:30:50 CEST
11:30:50 UTC
Launched successfully
Time known to the second
We last checked
- Window opens
- Window closes
The mission
A Falcon 9 launched IMAP & others from Kennedy Space Center, Florida.
IMAP (Interstellar Mapping and Acceleration Probe) is a NASA mission to study interactions between solar wind and the local interstellar medium. Carrying a suite of 10 scientific instruments, IMAP is able to investigate how particles are accelerated, determine their composition, as well as help to advance space weather forecasting models. The IMAP launch also includes the space weather satellite SWFO-L1 (Space Weather Follow-On - L1) for NOAA and the GLIDE (Global Lyman-alpha Imagers of the Dynamic Exosphere/Carruthers Geocorona Observatory) mission to study far ultraviolet emission in the Earth's exosphere.
- Mission type
- Heliophysics
- Orbit
- Heliocentric L1
Launch timeline
Times are relative to liftoff.
- T-38 min
GO for Prop Load
Launch director verifies go for propellant load
- T-35 min
Stage 1 LOX Load
Start of liquid oxygen loading in the first stage
- T-35 min
Prop Load
Start of propelland loading
- T-16 min
Stage 2 LOX Load
Start of liquid oxygen loading in the second stage
- T-7 min
Engine Chill
Start of engine chilling
- T-1 min
Tank Press
Fuel tanks are pressurized to flight levels
- T-1 min
Startup
The onboard computer takes control over the countdown and runs last checks
- T-45 s
GO for Launch
Launch director verifies go for launch
- T-3 s
Ignition
Start of the engine ignition sequence
- T-0
Liftoff
First upwards movement of the rocket
- T+1 min 12 s
Max-Q
Maximum dynamic pressure
- T+2 min 29 s
MECO
Cut-off of the main engine
- T+2 min 32 s
Stage 2 Separation
Separation of the second stage from the first
- T+2 min 40 s
SES-1
First start of the second engine
- T+3 min 12 s
Fairing Separation
Separation of the payload fairing
- T+6 min 37 s
Entry Burn Startup
Start of the atmospheric entry burn
- T+7 min 7 s
Entry Burn Shutdown
End of the atmospheric entry burn
- T+7 min 52 s
SECO-1
First cut-off of the second engine
- T+8 min 20 s
Stage 1 Landing Burn
Start of the first stage landing burn
- T+8 min 45 s
Stage 1 Landing
Landing of the first stage
- T+1 h 12 min 28 s
SES-2
Second start of the second engine
- T+1 h 13 min 30 s
SECO-2
Second cut-off of the second engine
- T+1 h 23 min 51 s
Payload Separation
Final deployment of the payload from the rocket
- T+1 h 30 min 26 s
Payload Separation
Final deployment of the payload from the rocket
- T+1 h 36 min 46 s
Payload Separation
Final deployment of the payload from the rocket
Rocket
Falcon 9 Block 5
- Reusable
- 649 launches so far
- Family
- Falcon, Falcon 9
- Manufacturer
- SpaceX
Launch site
Launch Complex 39A
Kennedy Space Center, FL, USA
28.61° N, 80.60° W
Open in mapsHow we know
The data on this page comes from Launch Library 2.
We last checked . We check Launch Library 2 about every ten minutes.
Launch Library 2 last changed this launch .
“Time known to the second” means Launch Library 2 gives the launch time to the second. How to read launch times
Related launches follow the listed dates, which can change.
Our records start in January 2025 and count orbital launches that have flown.
Every change and update (28)
We started following this launch on .
- Launch Library 2 update
Launch success with acquisition of signal from all 3 spacecraft.
Read the source update - Launch Library 2 update
Liftoff.
Read the source update - Launch Library 2 update
Official Webcast by NASA has started
Read the source update - Launch Library 2 update
Now targeting Sep 24 at 11:30:50 UTC
Read the source update - Launch Library 2 update
Weather is 90% favorable for launch.
Read the source update - Launch Library 2 update
Delayed to September 24.
Read the source update - Launch Library 2 update
Weather is 75% favorable for launch.
Read the source update - Launch Library 2 update
Weather is 80% favorable for launch.
Read the source update - Launch Library 2 update
Tweaked T-0.
Read the source update - Launch Library 2 update
Setting GO.
Read the source update - Launch Library 2 update
Updated T-0.
Read the source update - Launch Library 2 update
Added launch time.
Read the source update - Launch Library 2 update
NET September 23.
Read the source update - Launch Library 2 update
Launch pad change.
Read the source update - Launch Library 2 update
Changed launch pad.
Read the source update - Launch Library 2 update
Reverted back to NET September.
Read the source update - Launch Library 2 update
NET Q4.
Read the source update - Launch Library 2 update
Changed launch pad.
Read the source update - Launch Library 2 update
NET September.
Read the source update - Launch Library 2 update
NET December.
Read the source update - Launch Library 2 update
NET September 2025
Read the source update - Launch Library 2 update
NET late 2025.
Read the source update - Launch Library 2 update
NET Q2 2025.
Read the source update - Launch Library 2 update
Reverting to NET 2025.
Read the source update - Launch Library 2 update
NET 29 April 2025.
Read the source update - Launch Library 2 update
NET May 2025.
Read the source update - Launch Library 2 update
NET February 2025.
Read the source update - Launch Library 2 update
NET December 2025
Read the source update