Nova-C IM-2 & Others
Falcon 9 Block 5, SpaceX
Launch Complex 39A, Kennedy Space Center, FL, USA
Launch time
T-0
Thu 27 Feb, 01:16:30 CET
00:16:30 UTC
The rocket put its payload into the planned orbit.
How sure is this date?
The source gives second precision. Launch plans can change.
Launch probability 99%
Launch record updated by LL2
Feed checkedMission
Nova-C IM-2 & Others on Falcon 9 Block 5. Thu 27 Feb 2025, 00:16:30 UTC. Reported outcome: Success. Launch site: Launch Complex 39A. Source: Launch Library 2.
This is the second mission of Nova-C lunar lander developed and built by Intuitive Machines. This time it carries a NASA payload called PRIME-1 (Polar Resources Ice Mining Experiment-1), which is to be the first demonstration of in-situ resource utilization on the Moon. PRIME-1 consists of two instruments: TRIDENT drill and Msolo mass spectrometer. Also on board are: * Lunar Trailblazer, a small (class D) lunar orbiter, part of NASA's SIMPLEx program, that will detect and map water on the lunar surface to determine how its form, abundance, and location relate to geology. Its mission is to aid in the understanding of lunar water and the Moon's water cycle. * Odin, a spacecraft for AstroForge, a company that plans to mine asteroid resources. Odin intends to head into deep space to observe near-Earth asteroid 2022 OB5 in preparation for their first retrieval mission. Odin will fly by the asteroid at a distance of about 1 kilometer, arriving 11 months after launch. * CHIMERA GEO 1, a transfer spacecraft by Epic Aerospace to a geostationary orbit, with the aim of covering an orbital position. For this launch, CHIMERA-GEO is carrying an unidentified 16U cubesat manifested by Exolaunch.
- Mission type
- Lunar Exploration
- Orbit
- Lunar Orbit
Rocket file imagery

File imagery: Crew-9, 28 September 2024. Falcon 9 lifting off from Space Launch Complex 40.
Credit: NASA/Keegan Barber · Public domain (NASA) · SourceMission patches
- IM-2
Patch artwork is not shown because its image licence is unconfirmed.
Launch timeline
Times are relative to liftoff.
- T-38 min
GO for Prop Load
Launch director verifies go for propellant load
- T-35 min
Stage 1 LOX Load
Start of liquid oxygen loading in the first stage
- T-35 min
Prop Load
Start of propelland loading
- T-16 min
Stage 2 LOX Load
Start of liquid oxygen loading in the second stage
- T-7 min
Engine Chill
Start of engine chilling
- T-1 min
Tank Press
Fuel tanks are pressurized to flight levels
- T-1 min
Startup
The onboard computer takes control over the countdown and runs last checks
- T-45 s
GO for Launch
Launch director verifies go for launch
- T-3 s
Ignition
Start of the engine ignition sequence
- T-0
Liftoff
First upwards movement of the rocket
- T+1 min 18 s
Max-Q
Maximum dynamic pressure
- T+2 min 30 s
MECO
Cut-off of the main engine
- T+2 min 34 s
Stage 2 Separation
Separation of the second stage from the first
- T+2 min 42 s
SES-1
First start of the second engine
- T+3 min 27 s
Fairing Separation
Separation of the payload fairing
- T+6 min 15 s
Entry Burn Startup
Start of the atmospheric entry burn
- T+6 min 41 s
Entry Burn Shutdown
End of the atmospheric entry burn
- T+7 min 55 s
SECO-1
First cut-off of the second engine
- T+8 min 1 s
Stage 1 Landing Burn
Start of the first stage landing burn
- T+8 min 31 s
Stage 1 Landing
Landing of the first stage
- T+36 min 25 s
SES-2
Second start of the second engine
- T+37 min 26 s
SECO-2
Second cut-off of the second engine
- T+43 min 38 s
Payload Separation
Final deployment of the payload from the rocket
- T+47 min 28 s
Payload Separation
Final deployment of the payload from the rocket
- T+47 min 48 s
Payload Separation
Final deployment of the payload from the rocket
- T+48 min 8 s
Payload Separation
Final deployment of the payload from the rocket
Slip history
Changes recorded by Space Right Now
No changes since we started tracking on .
Source updates from Launch Library 2 (16)
Announcements supplied by LL2 may predate our tracking. They are separate from changes observed by Space Right Now.
- LL2 update
Nova-C IM-2 acquisition of signal confirmed.
Read the source update - LL2 update
All spacecraft deployed.
Read the source update - LL2 update
Liftoff.
Read the source update - LL2 update
Official Webcast by NASA has started
Read the source update - LL2 update
Tweaked T-0.
Read the source update - LL2 update
Weather is >95% favorable for launch.
Read the source update - LL2 update
GO for launch.
Read the source update - LL2 update
Added launch time.
Read the source update - LL2 update
Added approximate launch time.
Read the source update - LL2 update
NET February 26th
Read the source update - LL2 update
NET February 27.
Read the source update - LL2 update
NET February.
Read the source update - LL2 update
Targeting between January 1 and January 5, 2025
Read the source update - LL2 update
NET December 2024.
Read the source update - LL2 update
NET Q4 2024.
Read the source update - LL2 update
NET mid-2023
Read the source update
Launch pad
Launch Complex 39A
Kennedy Space Center, FL, USA (US)
Coordinates: 28.60822681, -80.60428186
View launch pad on a map