SDA Tranche 1 Transport Layer E
Falcon 9 Block 5, SpaceX
Space Launch Complex 4E, Vandenberg SFB, CA, USA
Launch time
T-0
Thu 16 Jul, 22:32:36 CEST
20:32:36 UTC
The rocket put its payload into the planned orbit.
- Window opens
- Window closes
How sure is this date?
The source gives second precision. Launch plans can change.
Launch probability 100%
Source updated
UpdatedSlip history
No changes since we started tracking on .
- LL2 update
Launch success.
Read the source update - LL2 update
Unofficial Re-stream by SPACE AFFAIRS has started
Read the source update - LL2 update
Liftoff.
Read the source update - LL2 update
Unofficial Re-stream by SPACE AFFAIRS has started
Read the source update - LL2 update
Tweaked T-0.
Read the source update - LL2 update
Tweaked T-0.
Read the source update - LL2 update
GO for launch.
Read the source update - LL2 update
NET July 16 per marine navigation warnings, TBC.
Read the source update
Show 1 older entries
- LL2 update
Adding launch
Read the source update
Mission
SDA Tranche 1 Transport Layer E on Falcon 9 Block 5 from Space Launch Complex 4E. Launch time, status and recorded date changes from Launch Library 2.
Tranche 1 Transport Layer E is one of six missions by the United States Space Force Space Development Agency (SDA) for the Proliferated Warfighter Space Architecture (PWSA) Tranche 1 Transport Layer constellation, which will provide assured, resilient, low-latency military data and connectivity worldwide to the full range of warfighter platforms from Low Earth Orbit satellites. The constellation will be interconnected with Optical Inter-Satellite Links (OISLs) which have significantly increased performance over existing radio frequency crosslinks. It is expected to operate over Ka band, have stereo coverage and be dynamically networked for simpler hand-offs, greater bandwidth and fault tolerance. This launch carries 21 satellites manufactured by York Space Systems.
- Mission type
- Government/Top Secret
- Orbit
- Polar Orbit

Mission patches
- SDA-T1TL-E
Patch artwork is not shown because its image licence is unconfirmed.
Launch timeline
Times are relative to liftoff.
- T-38 min
GO for Prop Load
Launch director verifies go for propellant load
- T-35 min
Stage 1 LOX Load
Start of liquid oxygen loading in the first stage
- T-35 min
Prop Load
Start of propelland loading
- T-16 min
Stage 2 LOX Load
Start of liquid oxygen loading in the second stage
- T-7 min
Engine Chill
Start of engine chilling
- T-1 min
Tank Press
Fuel tanks are pressurized to flight levels
- T-1 min
Startup
The onboard computer takes control over the countdown and runs last checks
- T-45 s
GO for Launch
Launch director verifies go for launch
- T-3 s
Ignition
Start of the engine ignition sequence
- T-0
Liftoff
First upwards movement of the rocket
- T+1 min 14 s
Max-Q
Maximum dynamic pressure
- T+2 min 29 s
MECO
Cut-off of the main engine
- T+2 min 33 s
Stage 2 Separation
Separation of the second stage from the first
- T+2 min 41 s
SES-1
First start of the second engine
- T+3 min 21 s
Fairing Separation
Separation of the payload fairing
- T+6 min 23 s
Entry Burn Startup
Start of the atmospheric entry burn
- T+6 min 46 s
Entry Burn Shutdown
End of the atmospheric entry burn
- T+8 min 13 s
Stage 1 Landing Burn
Start of the first stage landing burn
- T+8 min 35 s
SECO-1
First cut-off of the second engine
- T+8 min 37 s
Stage 1 Landing
Landing of the first stage
Launch pad
Space Launch Complex 4E
Vandenberg SFB, CA, USA (US)
Coordinates: 34.632, -120.611
View launch pad on a map