Starlink Group 12-11
Falcon 9 Block 5, SpaceX
Launch Complex 39A, Kennedy Space Center, FL, USA
Launch time
Window opens
Wed 8 Jan, 16:27:00 CET
15:27:00 UTC
The rocket put its payload into the planned orbit.
- Window closes
How sure is this date?
The source gives second precision. Launch plans can change.
Launch record updated by LL2
Feed checkedMission
Starlink Group 12-11 on Falcon 9 Block 5. Wed 8 Jan 2025, 15:27:00 UTC. Reported outcome: Success. Launch site: Launch Complex 39A. Source: Launch Library 2.
A batch of 21 satellites for the Starlink mega-constellation - SpaceX's project for space-based Internet communication system.
- Mission type
- Communications
- Orbit
- Low Earth Orbit
Programmes: Starlink

Mission patches
- Space X Starlink Mission Patch
Patch artwork is not shown because its image licence is unconfirmed.
Launch timeline
Times are relative to liftoff. Clock times are not shown while T-0 is unconfirmed or on hold.
- T-38 min
GO for Prop Load
Launch director verifies go for propellant load
- T-35 min
Prop Load
Start of propelland loading
- T-35 min
Stage 1 LOX Load
Start of liquid oxygen loading in the first stage
- T-16 min
Stage 2 LOX Load
Start of liquid oxygen loading in the second stage
- T-7 min
Engine Chill
Start of engine chilling
- T-1 min
Startup
The onboard computer takes control over the countdown and runs last checks
- T-1 min
Tank Press
Fuel tanks are pressurized to flight levels
- T-45 s
GO for Launch
Launch director verifies go for launch
- T-3 s
Ignition
Start of the engine ignition sequence
- T-0
Liftoff
First upwards movement of the rocket
- T+1 min 12 s
Max-Q
Maximum dynamic pressure
- T+2 min 26 s
MECO
Cut-off of the main engine
- T+2 min 30 s
Stage 2 Separation
Separation of the second stage from the first
- T+2 min 37 s
SES-1
First start of the second engine
- T+3 min 6 s
Fairing Separation
Separation of the payload fairing
- T+6 min 4 s
Entry Burn Startup
Start of the atmospheric entry burn
- T+6 min 29 s
Entry Burn Shutdown
End of the atmospheric entry burn
- T+7 min 43 s
Stage 1 Landing Burn
Start of the first stage landing burn
- T+8 min 14 s
Stage 1 Landing
Landing of the first stage
- T+8 min 40 s
SECO-1
First cut-off of the second engine
- T+53 min 57 s
SES-2
Second start of the second engine
- T+53 min 59 s
SECO-2
Second cut-off of the second engine
- T+1 h 5 min 6 s
Starlink Deployment
Deployment of the Starlink stack from the rocket
Slip history
Changes recorded by Space Right Now
No changes since we started tracking on .
Source updates from Launch Library 2 (8)
Announcements supplied by LL2 may predate our tracking. They are separate from changes observed by Space Right Now.
- LL2 update
Launch success.
Read the source update - LL2 update
Liftoff.
Read the source update - LL2 update
Unofficial Webcast by SPACE AFFAIRS has started
Read the source update - LL2 update
GO for launch.
Read the source update - LL2 update
Updating window to match launch opportunities
Read the source update - LL2 update
Delayed to NET January 8.
Read the source update - LL2 update
Delayed to NET January 7.
Read the source update - LL2 update
Added launch.
Read the source update
Launch pad
Launch Complex 39A
Kennedy Space Center, FL, USA (US)
Coordinates: 28.60822681, -80.60428186
View launch pad on a map