
Transporter 17 (Dedicated SSO Rideshare)
Falcon 9 Block 5, SpaceX
T-0
Tue 7 Jul, 09:12:00 CEST
07:12:00 UTC
Launched successfully
Time known to the second
We last checked
- Window opens
- Window closes
The mission
A Falcon 9 launched Transporter 17 (Dedicated SSO Rideshare) to a Sun-synchronous orbit from Vandenberg, California.
Dedicated rideshare flight to a sun-synchronous orbit with dozens of small microsatellites and nanosatellites for commercial and government customers.
- Mission type
- Dedicated Rideshare
Launch timeline
Times are relative to liftoff.
- T-38 min
GO for Prop Load
Launch director verifies go for propellant load
- T-35 min
Stage 1 LOX Load
Start of liquid oxygen loading in the first stage
- T-35 min
Prop Load
Start of propelland loading
- T-16 min
Stage 2 LOX Load
Start of liquid oxygen loading in the second stage
- T-7 min
Engine Chill
Start of engine chilling
- T-1 min
Startup
The onboard computer takes control over the countdown and runs last checks
- T-1 min
Tank Press
Fuel tanks are pressurized to flight levels
- T-45 s
GO for Launch
Launch director verifies go for launch
- T-3 s
Ignition
Start of the engine ignition sequence
- T-0
Liftoff
First upwards movement of the rocket
- T+1 min 9 s
Max-Q
Maximum dynamic pressure
- T+2 min 26 s
MECO
Cut-off of the main engine
- T+2 min 30 s
Stage 2 Separation
Separation of the second stage from the first
- T+2 min 38 s
SES-1
First start of the second engine
- T+3 min 12 s
Fairing Separation
Separation of the payload fairing
- T+6 min 5 s
Entry Burn Startup
Start of the atmospheric entry burn
- T+6 min 30 s
Entry Burn Shutdown
End of the atmospheric entry burn
- T+8 min 4 s
Stage 1 Landing Burn
Start of the first stage landing burn
- T+8 min 26 s
Stage 1 Landing
Landing of the first stage
- T+51 min 2 s
SES-2
Second start of the second engine
- T+51 min 6 s
SECO-2
Second cut-off of the second engine
- T+54 min 31 s
Payload Deployment Sequence Start
Start of the payload deployment sequence
- T+1 h 12 min 24 s
Payload Deployment Sequence End
End of the payload deployment sequence.
- T+1 h 45 min 1 s
SES-3
Third start of the second engine
- T+1 h 45 min 6 s
SECO-3
Third cut-off of the second engine
- T+2 h 26 min 4 s
SES-4
Fourth start of the second engine
- T+2 h 26 min 6 s
SECO-4
Fourth cut-off of the second engine
- T+2 h 30 min 12 s
Payload Separation
Final deployment of the payload from the rocket
Rocket
Falcon 9 Block 5
- Reusable
- 649 launches so far
- Family
- Falcon, Falcon 9
- Manufacturer
- SpaceX
Launch site
Space Launch Complex 4E
Vandenberg SFB, CA, USA
34.63° N, 120.61° W
Open in mapsHow we know
The data on this page comes from Launch Library 2.
We last checked . We check Launch Library 2 about every ten minutes.
Launch Library 2 last changed this launch .
“Time known to the second” means Launch Library 2 gives the launch time to the second. How to read launch times
Related launches follow the listed dates, which can change.
Our records start in January 2025 and count orbital launches that have flown.
Every change and update (9)
We started following this launch on .
- Launch Library 2 update
All payloads deployed, launch success.
Read the source update - Launch Library 2 update
Liftoff
Read the source update - Launch Library 2 update
Unofficial Re-stream by SPACE AFFAIRS has started
Read the source update - Launch Library 2 update
Now targeting Jul 07 at 07:12 UTC
Read the source update - Launch Library 2 update
Updated launch window.
Read the source update - Launch Library 2 update
GO for launch.
Read the source update - Launch Library 2 update
NET July 7, TBC.
Read the source update - Launch Library 2 update
NET July.
Read the source update - Launch Library 2 update
Added launch.
Read the source update