Skip to content
Space Right Now

NISAR (NASA-ISRO Synthetic Aperture Radar)

GSLV Mk. II, Indian Space Research Organization

Satish Dhawan Space Centre Second Launch Pad, Satish Dhawan Space Centre, India

Launch time

T-0

Wed 30 Jul, 14:10 CEST

12:10 UTC

The rocket put its payload into the planned orbit.

How sure is this date?

The source gives minute precision. Launch plans can change.

Launch record updated by LL2

Feed checked
Add to calendar

Mission

NISAR (NASA-ISRO Synthetic Aperture Radar) on GSLV Mk. II. Wed 30 Jul 2025, 12:10 UTC. Reported outcome: Success. Launch site: Satish Dhawan Space Centre Second Launch Pad. Source: Launch Library 2.

The NASA-ISRO Synthetic Aperture Radar, or NISAR satellite, will use advanced radar imaging to map the elevation of Earth's land and ice masses 4 to 6 times a month at resolutions of 5 to 10 meters. It is designed to observe and measure some of the planet's most complex natural processes, including ecosystem disturbances, ice-sheet collapse, and natural hazards such as earthquakes, tsunamis, volcanoes and landslides. Under the terms of the agreement, NASA will provide the mission's L band synthetic aperture radar (SAR), a high-rate telecommunication subsystem for scientific data, GPS receivers, a solid-state recorder, and a payload data subsystem. ISRO will provide the satellite bus, an S band synthetic aperture radar, the launch vehicle, and associated launch services.

Mission type
Earth Science
Orbit
Sun-Synchronous Orbit

Launch timeline

Times are relative to liftoff.

  1. T-5 s

    Ignition

    Start of the engine ignition sequence

  2. T-0

    Liftoff

    First upwards movement of the rocket

  3. T+2 min 29 s

    MECO

    Cut-off of the main engine

  4. T+2 min 30 s

    SES

    Start of the second engine

  5. T+2 min 31 s

    Stage 2 Separation

    Separation of the second stage from the first

  6. T+2 min 51 s

    Fairing Separation

    Separation of the payload fairing

  7. T+4 min 50 s

    SECO

    Cut-off of the second engine

  8. T+4 min 53 s

    Stage 3 Separation

    Separation of the third stage from the second

  9. T+4 min 54 s

    Stage 3 Ignition

    Third stage engine ignites.

  10. T+18 min 21 s

    Stage 3 Cutoff

    Third stage engine shuts down.

  11. T+18 min 36 s

    Payload Separation

    Final deployment of the payload from the rocket

Slip history

Changes recorded by Space Right Now

No changes since we started tracking on .

    Source updates from Launch Library 2 (21)

    Announcements supplied by LL2 may predate our tracking. They are separate from changes observed by Space Right Now.

    1. LL2 update

      Satellite in operation.

      Read the source update
    2. LL2 update

      Spacecraft separation.

      Read the source update
    3. LL2 update

      Liftoff.

      Read the source update
    4. LL2 update

      Official Webcast by NASA has started

      Read the source update
    5. LL2 update

      GO for launch.

      Read the source update
    6. LL2 update

      NET July 30.

      Read the source update
    7. LL2 update

      NET July 16.

      Read the source update
    8. LL2 update

      NET July 5.

      Read the source update
    9. LL2 update

      NET June 18 per NOTAMs, TBC.

      Read the source update
    10. LL2 update

      NET June.

      Read the source update
    11. LL2 update

      NET May 20

      Read the source update
    12. LL2 update

      NET Q2.

      Read the source update
    13. LL2 update

      NET late March.

      Read the source update
    14. LL2 update

      NET February.

      Read the source update
    15. LL2 update

      Slipped to NET early 2025 due to satellite issues.

      Read the source update
    16. LL2 update

      NET October.

      Read the source update
    17. LL2 update

      NET late May.

      Read the source update
    18. LL2 update

      NET Q2 2024.

      Read the source update
    19. LL2 update

      NET March 30.

      Read the source update
    20. LL2 update

      NET early 2024.

      Read the source update
    21. LL2 update

      Delayed to 2024

      Read the source update

    Launch pad

    Satish Dhawan Space Centre Second Launch Pad

    Satish Dhawan Space Centre, India (IN)

    Coordinates: 13.7199, 80.2304

    View launch pad on a map
    Launch data: The Space Devs (Launch Library 2)

    Launch plans change. Times are estimates from the source, not a guarantee of liftoff.