Maiden Flight
New Glenn, Blue Origin
T-0
Thu 16 Jan 2025, 08:03 CET
07:03 UTC
Launched successfully
Time known to the minute
We last checked
- Window opens
- Window closes
The mission
A New Glenn launched Maiden Flight to medium Earth orbit from Cape Canaveral, Florida.
Maiden flight of the New Glenn launch vehicle. Will carry the prototype Blue Ring payload tug and payload hoisting platform, consisting of communications array, power systems, and a flight computer affixed to a secondary payload adapter ring, remaining attached to the 2nd stage. This launch will serve as New Glenn's first National Security Space Launch certification flight. Target orbit is 2400 x 19300 km at 30° inclination.
- Mission type
- Test Flight
Launch timeline
Times are relative to liftoff.
- T-4 h 30 min
Stage 2 LH2 Load
Start of liquid hydrogen loading in the second stage
- T-4 h
Stage 2 LOX Load
Start of liquid oxygen loading in the second stage
- T-4 h
Stage 1 LOX Load
Start of liquid oxygen loading in the first stage
- T-3 h 30 min
Stage 1 LNG Load
Start of liquid methane loading in the first stage
- T-1 h
Prop Load Complete
End of propellant loading
- T-1 h
Webcast live
Start of the launch broadcast
- T-20 min
Weather Check
Check of the weather conditions for launch
- T-10 min
Ready Poll
Polling ready ahead of terminal count
- T-4 min
Terminal Count
Start of the terminal countdown towards launch
- T-2 min 30 s
Tank Press
Fuel tanks are pressurized to flight levels
- T-1 min 30 s
Internal Power
Launch vehicle switches to internal power sources
- T-20 s
Water Deluge
Water deluge systems turn on
- T-20 s
Startup
The onboard computer takes control over the countdown and runs last checks
- T-5.6 s
Ignition
Start of the engine ignition sequence
- T-0
Liftoff
First upwards movement of the rocket
- T+1 min 39 s
Max-Q
Maximum dynamic pressure
- T+3 min 10 s
MECO
Cut-off of the main engine
- T+3 min 12 s
Stage 2 Separation
Separation of the second stage from the first
- T+3 min 23 s
SES-1
First start of the second engine
- T+3 min 46 s
Kármán Line
The vehicle crosses the Kármán Line (100 km altitude)
- T+3 min 49 s
Fairing Separation
Separation of the payload fairing
- T+7 min 17 s
Entry Burn Startup
Start of the atmospheric entry burn
- T+7 min 45 s
Entry Burn Shutdown
End of the atmospheric entry burn
- T+8 min 52 s
Stage 1 Landing Burn
Start of the first stage landing burn
- T+9 min 28 s
Stage 1 Landing
Landing of the first stage
- T+12 min 51 s
SECO-1
First cut-off of the second engine
- T+13 min 51 s
Payload Power On
Startup of the payload
- T+57 min 42 s
SES-2
Second start of the second engine
- T+58 min 58 s
SECO-2
Second cut-off of the second engine
- T+1 h 59 min 18 s
Stage 2 Orientation Maneuver
Stage 2 maneuver to change its attitude
- T+5 h 50 min 58 s
Mission End
End of the launch vehicle's mission
Rocket
New Glenn
- Reusable
- 3 launches so far
- Manufacturer
- Blue Origin
Launch site
Launch Complex 36A
Cape Canaveral SFS, FL, USA
28.47° N, 80.54° W
Open in mapsHow we know
The data on this page comes from Launch Library 2.
We last checked . We check Launch Library 2 about every ten minutes.
Launch Library 2 last changed this launch .
“Time known to the minute” means Launch Library 2 gives the launch time to the minute. How to read launch times
Related launches follow the listed dates, which can change.
Our records start in January 2025 and count orbital launches that have flown.
Every change and update (38)
We started following this launch on .
- Launch Library 2 update
Launch success, 2nd stage and payload reached planned orbit.
Read the source update - Launch Library 2 update
Liftoff.
Read the source update - Launch Library 2 update
New T-0.
Read the source update - Launch Library 2 update
Hold at T-11:03.
Read the source update - Launch Library 2 update
New T-0.
Read the source update - Launch Library 2 update
Holding at T-20:50.
Read the source update - Launch Library 2 update
Updated launch weather.
Read the source update - Launch Library 2 update
Updated launch weather.
Read the source update - Launch Library 2 update
Shifted date to January 16th as per Blue Origin update
Read the source update - Launch Library 2 update
Weather is 30% favorable for launch.
Read the source update - Launch Library 2 update
Scrubbed for the day.
Read the source update - Launch Library 2 update
On hold, potential scrub for the day.
Read the source update - Launch Library 2 update
New T-0.
Read the source update - Launch Library 2 update
New T-0.
Read the source update - Launch Library 2 update
New T-0.
Read the source update - Launch Library 2 update
New T-0.
Read the source update - Launch Library 2 update
New T-0.
Read the source update - Launch Library 2 update
Tweaked T-0.
Read the source update - Launch Library 2 update
New T-0.
Read the source update - Launch Library 2 update
Official Webcast by Blue Origin has started
Read the source update - Launch Library 2 update
Weather 90%
Read the source update - Launch Library 2 update
Delayed by a day due to unfavorable recovery weather
Read the source update - Launch Library 2 update
Updated launch weather.
Read the source update - Launch Library 2 update
Weather is 90% favorable for launch.
Read the source update - Launch Library 2 update
Updated launch weather predictions for January 12.
Read the source update - Launch Library 2 update
Delayed to NET January 12 due to booster landing weather.
Read the source update - Launch Library 2 update
Weather is >95% favorable for launch.
Read the source update - Launch Library 2 update
Updated launch window.
Read the source update - Launch Library 2 update
GO for launch.
Read the source update - Launch Library 2 update
Delayed to NET January 10 per marine navigation warnings.
Read the source update - Launch Library 2 update
Delayed to NET January 8 per NOTAMs 5/0210.
Read the source update - Launch Library 2 update
Updated launch window.
Read the source update - Launch Library 2 update
Updating launch window
Read the source update - Launch Library 2 update
NET January 6 following successful static fire test.
Read the source update - Launch Library 2 update
NET early January, pending successful static fire test.
Read the source update - Launch Library 2 update
NET December.
Read the source update - Launch Library 2 update
NET late 2024.
Read the source update - Launch Library 2 update
Added launch.
Read the source update