Skip to content
Space Right Now

EOS-09 (RISAT-1B)

PSLV XL, Indian Space Research Organization

Satish Dhawan Space Centre First Launch Pad, Satish Dhawan Space Centre, India

Launch time

T-0

Sun 18 May, 02:29 CEST

00:29 UTC

The rocket did not reach orbit, or the payload did not separate from it.

Window opens
Window closes

How sure is this date?

The source gives minute precision. Launch plans can change.

Launch record updated by LL2

Feed checked
Add to calendar

Mission

EOS-09 (RISAT-1B) on PSLV XL. Sun 18 May 2025, 00:29 UTC. Reported outcome: Failure. Launch site: Satish Dhawan Space Centre First Launch Pad. Source: Launch Library 2.

RISAT-1B is the third in the series of radar imaging RISAT-1 satellites of ISRO using an active C-band SAR (Synthetic Aperture Radar), providing all-weather as well as the day-and-night SAR observation capability in applications such as agriculture, forestry, soil moisture, geology, sea ice, coastal monitoring, object identification, and flood monitoring, in addition to military surveillance. The RISAT-1 series is developed, manufactured and integrated by ISRO. The 3-axis stabilized spacecraft bus consists of a hexagonal prism shape build around a central cylinder. Most of the spacecraft subsystems and the payload are integrated in the prism structure and the central cylinder. The solar panels and some subsystems are mounted on the cube-shaped section of the spacecraft.

Mission type
Government/Top Secret
Orbit
Sun-Synchronous Orbit

Launch timeline

Times are relative to liftoff.

  1. T-3 s

    RCT Ignition

    Ignition of Roll Control Thrusters

  2. T-0

    Ignition

    Start of the engine ignition sequence

  3. T+0.42 s

    Booster Ignition

    Ignition of the solid rocket boosters.

  4. T+0.62 s

    Booster Ignition

    Ignition of the solid rocket boosters.

  5. T+25 s

    Booster Ignition

    Ignition of the solid rocket boosters.

  6. T+1 min 9.9 s

    Booster Separation

    The side boosters are separated from the launcher.

  7. T+1 min 10.1 s

    Booster Separation

    The side boosters are separated from the launcher.

  8. T+1 min 32 s

    Booster Separation

    The side boosters are separated from the launcher.

  9. T+1 min 51.64 s

    Stage 2 Separation

    Separation of the second stage from the first

  10. T+1 min 51.84 s

    SES

    Start of the second engine

  11. T+2 min 32.78 s

    Fairing Separation

    Separation of the payload fairing

  12. T+2 min 37.78 s

    CLG Start

    Start of Closed Loop Guidance

  13. T+4 min 24.34 s

    Stage 3 Separation

    Separation of the third stage from the second

  14. T+4 min 25.54 s

    Stage 3 Ignition

    Third stage engine ignites.

  15. T+8 min 13 s

    Kick Stage Separation

    Separation of the kick stage from the previous stage

  16. T+8 min 23.4 s

    Kick Stage Ignition

    Start of the kick stage engine

  17. T+16 min 52.24 s

    Kick Stage Cut-off

    Cut-off of the kick stage engine

  18. T+17 min 39.24 s

    Payload Separation

    Final deployment of the payload from the rocket

  19. T+37 min 11.52 s

    Kick Stage Ignition

    Start of the kick stage engine

  20. T+45 min 56.78 s

    Kick Stage Cut-off

    Cut-off of the kick stage engine

  21. T+1 h 22 min 32.52 s

    Kick Stage Ignition

    Start of the kick stage engine

  22. T+1 h 31 min 2.04 s

    Kick Stage Cut-off

    Cut-off of the kick stage engine

  23. T+1 h 32 min 52.04 s

    MON Passivation

    Start of Mixed Oxides of Nitrogen passivation

  24. T+1 h 41 min 52.04 s

    MMH Passivation

    Start of Monomethylhydrazine passivation

Slip history

Changes recorded by Space Right Now

No changes since we started tracking on .

    Source updates from Launch Library 2 (8)

    Announcements supplied by LL2 may predate our tracking. They are separate from changes observed by Space Right Now.

    1. LL2 update

      Launch failure.

      Read the source update
    2. LL2 update

      Liftoff.

      Read the source update
    3. LL2 update

      Official Webcast by ISRO Official has started

      Read the source update
    4. LL2 update

      Adjusted T-0.

      Read the source update
    5. LL2 update

      Added launch time.

      Read the source update
    6. LL2 update

      Added launch window, NET May 18.

      Read the source update
    7. LL2 update

      NET May 19.

      Read the source update
    8. LL2 update

      Added launch.

      Read the source update

    Launch pad

    Satish Dhawan Space Centre First Launch Pad

    Satish Dhawan Space Centre, India (IN)

    Coordinates: 13.733, 80.235

    View launch pad on a map
    Launch data: The Space Devs (Launch Library 2)

    Launch plans change. Times are estimates from the source, not a guarantee of liftoff.