
File imagery: Artemis II lifts off on 1 April 2026.
Credit: NASA/Joel Kowsky · Public domain (NASA) · SourceArtemis II
Space Launch System Block 1, National Aeronautics and Space Administration
T-0
Thu 2 Apr, 00:35:12 CEST
Wed 1 Apr, 22:35:12 UTC
Launched successfully
Time known to the second
We last checked
- Window opens
- Window closes
The mission
A Space Launch System (SLS) launched Artemis II from Kennedy Space Center, Florida.
Artemis II is the first crewed mission as part of the Artemis program. Artemis II will send a crew of 4 - 3 Americans and 1 Canadian around the moon and return them back to Earth. The mission will test the core systems of NASA's Orion spacecraft including the critical life support system, among other systems which could not be tested during Artemis I due to the lack of crew onboard.
- Mission type
- Human Exploration
- Orbit
- Lunar flyby
- Programme
- Artemis
Launch timeline
Times are relative to liftoff.
- T-2 d 1 h 50 min
Launch Team On Stations
Launch team arrives to stations
- T-2 d 1 h 40 min
Prop Load Preparations
Ground systems preparations for vehicle loading
- T-2 d 1 h 40 min
Countdown Start
Countdown clock begins
- T-1 d 21 h 30 min
Orion Power On
Orion spacecraft powered up
- T-1 d 18 h 20 min
Core Stage Power On
Core stage powered up
- T-1 d 18 h 10 min
ICPS Power On
Interim cryogenic propulsion stage (ICPS) powered up
- T-1 d 15 h 45 min
RS-25 Preparations
Final preparations of the four RS-25 engines
- T-1 d 11 h 45 min
ICPS Power Off
Interim cryogenic propulsion stage (ICPS) powered down
- T-1 d 9 h 30 min
Orion Batteries Charging
Charge Orion flight batteries to 100%
- T-1 d 7 h 30 min
Core Stage Batteries Charging
Charge core stage flight batteries
- T-20 h 15 min
ICPS Power On
Interim cryogenic propulsion stage (ICPS) powered up
- T-15 h
Pad Closeout
All non-essential personnel leave the launch pad
- T-14 h 15 min
Rocket Cavity Inerting
Air-to-gaseous nitrogen (GN2) changeover and rocket cavity inerting
- T-13 h 15 min
GLS Activation
Ground launch sequencer (GLS) activation
- T-12 h 35 min
Built-In Hold
Built in countdown hold
- T-10 h 50 min
Orion Cold Soak
Orion cold soak
- T-10 h 50 min
GO for Prop Load
Launch director verifies go for propellant load
- T-10 h 40 min
Core Stage LH2 Chill
Core stage LH2 chilldown
- T-10 h 40 min
Core Stage LOX Transfer Chill
Core stage LOX transfer line chilldown
- T-10 h 25 min
Core Stage LOX Prop Chill
Core stage LOX main propulsion system chilldown
- T-9 h 55 min
Core Stage LH2 Slow Fill
Core stage LH2 slow fill start
- T-9 h 50 min
Resume T-Clock
Resume T-Clock
- T-9 h 40 min
Core Stage LOX Slow Fill
Core stage LOX slow fill
- T-9 h 30 min
Core Stage LOX Fast Fill
Core stage LOX fast fill
- T-9 h 25 min
Core Stage LH2 Fast Fill
Core stage LH2 fast fill
- T-9 h 5 min
ICPS LH2 Chill
ICPS LH2 chilldown
- T-8 h 30 min
ICPS LH2 Fast Fill
ICPS LH2 fast fill start
- T-8 h
Core Stage LH2 Topping
Core stage LH2 topping
- T-7 h 55 min
Core Stage LH2 Replenish
Core stage LH2 replenish
- T-7 h 45 min
ICPS LH2 Vent & Relief Test
ICPS LH2 vent and relief test
- T-7 h 20 min
ICPS LH2 Topping
ICPS LH2 tank topping start
- T-7 h 5 min
ICPS LH2 Replenish
ICPS LH2 replenish
- T-6 h 40 min
Core Stage LOX Topping
Core stage LOX topping
- T-6 h 40 min
Orion Comms On
Orion communications system activated (radio frequency to mission control)
- T-6 h 40 min
ICPS LOX Prop Chill
ICPS LOX main propulsion system chilldown
- T-6 h 30 min
ICPS LOX Fast Fill
ICPS LOX fast fill
- T-6 h 10 min
Closeout Crew Assemble
Closeout crew assemble
- T-6 h 10 min
Stage Pad Rescue
Stage pad rescue
- T-6 h 5 min
Core Stage LOX Replenish
Core stage LOX replenish
- T-6 h
Weather Check
Check of the weather conditions for launch
- T-5 h 45 min
ICPS LOX Vent & Relief Test
ICPS LOX vent and relief test
- T-5 h 30 min
ICPS LOX Topping
ICPS LOX topping
- T-5 h 10 min
Built-In Hold
Built in countdown hold
- T-5 h 10 min
Closeout Crew To White Room
Closeout crew to white room
- T-5 h 10 min
ICPS LOX Replenish
ICPS LOX replenish
- T-5 h 10 min
All Stages Replenish
All stages replenish
- T-4 h 40 min
Flight Crew To Pad
Flight crew deployment to pad
- T-4 h
Orion Boarding
Flight crew board Orion
- T-3 h 40 min
Hatch Closure
Crew module hatch preps and closure
- T-3 h 10 min
Hatch Seal Checks
Counterbalance mechanism hatch sealpress decay checks
- T-2 h 20 min
Hatch Closeouts
Crew module hatch service panel install/closeouts
- T-1 h 40 min
LAS Hatch Closure
Launch abort system (LAS) hatch closure for flight
- T-1 h 10 min
TPS Scan
Launch director brief – rocket & thermal protection system scan results with the imagery console
- T-50 min
Pad Clear
Closeout crew departs the pad
- T-50 min
Test Director Briefing
Final test director briefing is held
- T-40 min
Built-In Hold
Built in countdown hold
- T-25 min
Orion Comms Transition
Transition team to Orion to Earth communication loop following final NTD briefing
- T-17 min
Ready Poll
Polling ready ahead of terminal count
- T-15 min
Visors Down
Flight crew visors down
- T-14 min
Short Purge
Flight crew short purge verification
- T-10 min
Terminal Count
Start of the terminal countdown towards launch
- T-8 min
Crew Access Arm Retract
Retraction of the crew access arm from the rocket
- T-6 min
Tank Press
Fuel tanks are pressurized to flight levels
- T-6 min
Orion Internal Power
Orion set to internal power
- T-6 min
Orion Pyros Arm
Orion ascent pyros are armed
- T-5 min 57 s
Core Stage LH2 Replenish End
Core stage LH2 terminate replenish
- T-5 min 20 s
LAS Available
LAS capability is available
- T-4 min 40 s
LH2 High Flow Bleed Check
GLS go for LH2 high flow bleed check
- T-4 min 30 s
FTS Arm
Flight termination system armed
- T-4 min
Core Stage LOX Replenish End
Core stage LOX terminate replenish
- T-4 min
Core Stage APU Start
Core stage auxiliary power unit (APU) start
- T-3 min 30 s
ICPS LOX Replenish End
ICPS LOX terminate replenish
- T-3 min 10 s
Purge Sequence 4
GLS go for purge sequence 4
- T-2 min 2 s
ICPS Internal Power
ICPS switches to internal battery power
- T-2 min
Booster Internal Power
Booster switches to internal batter power
- T-1 min 30 s
Core Stage Internal Power
Core stage switches to internal power
- T-1 min 20 s
ICPS Terminal Count
ICPS enters terminal countdown mode
- T-50 s
ICPS LH2 Replenish End
ICPS LH2 terminate replenish
- T-33 s
GO for Launch
Launch director verifies go for launch
- T-30 s
Core Stage Terminal Count
Core stage flight computer to automated launching sequencer
- T-12 s
Hydrogen Burnoff Igniters
Hydrogen burn off igniters initiated
- T-10 s
Core Stage Engine Start
Core stage engine start
- T-6.36 s
Ignition
Start of the engine ignition sequence
- T-0
Booster Ignition
Ignition of the solid rocket boosters.
- T-0
Liftoff
First upwards movement of the rocket
- T+9 s
Tower Clear
The launch vehicle clears the launch tower and initiates a roll/pitch maneuver
- T+56 s
Supersonic
Vehicle is supersonic
- T+1 min 10 s
Max-Q
Maximum dynamic pressure
- T+2 min 8 s
SRB Separation
The solid rocket boosters are separated from the launcher.
- T+3 min 18 s
Launch Escape Jettison
The launch escape system is no longer needed and is jettisoned.
- T+8 min 6 s
MECO
Cut-off of the main engine
- T+8 min 18 s
Stage 2 Separation
Separation of the second stage from the first
- T+8 min 28 s
ICPS RL10 Nozzle Extension
ICPS RL10 nozzle extension
- T+20 min
Orion Solar Arrays Deployment
Orion solar arrays deploy
- T+49 min
Perigee Raise Burn
Perigee raise burn
- T+1 h 47 min 57 s
Apogee Raise Burn
Apogee raise burn
- T+3 h 24 min 15 s
Orion Separation
Orion separates from ICPS
- T+4 h 35 min
Proximity Operations End
Proximity operations conclude
- T+4 h 52 min
Orion Separation Burn
Orion upper stage separation burn
- T+5 h
ICPS Disposal Burn
Disposal burn of ICPS into the Pacific Ocean
- T+5 h 4 min
CubeSats Deployment
CubeSats deploy
- T+13 h 44 min
Perigee Raise Burn
Perigee raise burn
- T+1 d 1 h 37 min
Translunar Injection Burn
Translunar injection burn
- T+1 d 23 h 25 min
Orbital Trajectory Correction Burn
Orbital trajectory correction burn
- T+2 d 7 min
Orbital Trajectory Correction Burn
Orbital trajectory correction burn
- T+2 d 2 h 5 min
Crew CPR Demo
Crew CPR demonstration
- T+2 d 5 h 25 min
DSN Comms Test
Communications test through Deep Space Network
- T+3 d 12 min
Orbital Trajectory Correction Burn
Orbital trajectory correction burn
- T+3 d 3 h 40 min
Lunar Flyby Imaging Plan Review
Review lunar flyby imaging plan
- T+3 d 5 h 45 min
Lunar Flyby Imaging Plan Review
Review lunar flyby imaging plan
- T+3 d 20 h 30 min
Spacesuits Demo
Rapid spacesuits donning and pressurization demonstration
- T+4 d 5 h 23 min
Orbital Trajectory Correction Burn
Orbital trajectory correction burn
- T+4 d 6 h 59 min
Orion Enters Lunar SOI
Orion enters lunar sphere of influence
- T+4 d 22 h
Lunar Flyby
Lunar flyby and observation begins
- T+5 d 1 h 23 min
Lunar Closest Approach
Closest approach to the Moon
- T+5 d 1 h 26 min
Max Distance To Earth
Crew reaches maximum distance from Earth for this mission
- T+5 d 19 h 47 min
Orion Exits Lunar SOI
Orion exits lunar sphere of influence
- T+5 d 21 h 10 min
Lunar Flyby Debrief
Lunar flyby science debrief
- T+6 d 4 h 23 min
Orbital Trajectory Correction Burn
Orbital trajectory correction burn
- T+7 d 1 h 50 min
Radiation Shielding Demo
Radiation shielding demonstration
- T+7 d 4 h 20 min
Manual Piloting Demo
Manual piloting demonstration
- T+7 d 23 h 15 min
Orthostatic Intolerance Garment Test
Orthostatic intolerance garment assessment
- T+8 d 2 h 10 min
Orthostatic Intolerance Garment Test
Orthostatic intolerance garment assessment
- T+8 d 4 h 33 min
Orbital Trajectory Correction Burn
Orbital trajectory correction burn
- T+8 d 20 h 33 min
Orbital Trajectory Correction Burn
Orbital trajectory correction burn
- T+8 d 22 h 30 min
Crew Entry Preparations
Crew begins working through entry checklist, including donning entry suits
- T+9 d 1 h 13 min
Orion Service Module Jettison
Orion crew and service module separation
- T+9 d 1 h 16 min
Orion Raise Burn
Orion raise burn
- T+9 d 1 h 33 min
Atmospheric Entry
Start of the atmospheric re-entry
- T+9 d 1 h 46 min
Orion Splashdown
Orion splashdown
- T+9 d 1 h 53 min
Orion RCS Safing
Orion crew module reaction control system safing
- T+9 d 2 h 1 min
Orion Power Off
Orion Final power down
Rocket
Space Launch System Block 1
- Expendable
- 2 launches so far
- Family
- Space Launch System
- Manufacturer
- National Aeronautics and Space Administration
Launch site
Launch Complex 39B
Kennedy Space Center, FL, USA
28.63° N, 80.62° W
Open in mapsHow we know
The data on this page comes from Launch Library 2.
We last checked . We check Launch Library 2 about every ten minutes.
Launch Library 2 last changed this launch .
“Time known to the second” means Launch Library 2 gives the launch time to the second. How to read launch times
Our records start in April 2026 and count orbital launches that have flown.
Every change and update (23)
We started following this launch on .
- Launch Library 2 update
Launch success with Orion separation.
Read the source update - Launch Library 2 update
Liftoff.
Read the source update - Launch Library 2 update
New T-0.
Read the source update - Launch Library 2 update
Extending hold at T-10 minutes.
Read the source update - Launch Library 2 update
Updated launch weather.
Read the source update - Launch Library 2 update
Official Webcast by NASA has started
Read the source update - Launch Library 2 update
Updated launch weather.
Read the source update - Launch Library 2 update
T-0 is accurate to the second.
Read the source update - Launch Library 2 update
Updated launch weather, 80% GO.
Read the source update - Launch Library 2 update
Targeting April 1st.
Read the source update - Launch Library 2 update
Delayed to NET April due to upper stage helium leak issue.
Read the source update - Launch Library 2 update
Reverted back to NET March 6 EST, to be confirmed.
Read the source update - Launch Library 2 update
Moved back up to NET March 3, to be confirmed (see also https://x.com/nasaspaceflight/status/2019805496836767830.)
Read the source update - Launch Library 2 update
Delayed to NET March, to be confirmed pending additional tests.
Read the source update - Launch Library 2 update
Delayed to NET February 8 EST, to be confirmed.
Read the source update - Launch Library 2 update
Refined launch window.
Read the source update - Launch Library 2 update
Updated approximate launch time.
Read the source update - Launch Library 2 update
Added launch window.
Read the source update - Launch Library 2 update
NET February 5.
Read the source update - Launch Library 2 update
Moved up to NET February.
Read the source update - Launch Library 2 update
NET April 2026.
Read the source update - Launch Library 2 update
NET September 2025.
Read the source update - Launch Library 2 update
NET November 2024
Read the source update