Skip to content
Space Right Now

Biomass

Vega-C, Arianespace

Ariane Launch Area 1 (ELV), Guiana Space Centre, French Guiana

Launch time

T-0

Tue 29 Apr, 11:15:52 CEST

09:15:52 UTC

The rocket put its payload into the planned orbit.

How sure is this date?

The source gives second precision. Launch plans can change.

Launch record updated by LL2

Feed checked
Add to calendar

Mission

Biomass on Vega-C. Tue 29 Apr 2025, 09:15:52 UTC. Reported outcome: Success. Launch site: Ariane Launch Area 1 (ELV). Source: Launch Library 2.

Biomass is an European Space Agency mission designed to measure the density of carbon stored in the world's forests. The spacecraft, built by Airbus Defence and Space, features the first civilian P-band synthetic aperture radar as well as a 12m-diameter deployable reflector from L3Harris made of over 900 km of gold-coated molybdenum 25µm wire. With a minimum operational lifetime of 5 years in its 666km 6am/6pm sun-synchronous orbit, the global coverage achieved every 9 months allows to precisely monitor the evolution of forests over time.

Mission type
Earth Science
Orbit
Sun-Synchronous Orbit
Vega-C liftoff on its maiden flight (LARES-2)
Credit: ESA/CNES/Arianespace/Optique vidéo du CSG–S. Martin · ESA Standard Licence (non-commercial)

Mission patches

  • Biomass Patch

Patch artwork is not shown because its image licence is unconfirmed.

Launch timeline

Times are relative to liftoff.

  1. T-0

    Liftoff

    First upwards movement of the rocket

  2. T+2 min 25 s

    Stage 2 Separation

    Separation of the second stage from the first

  3. T+4 min 31 s

    Stage 3 Separation

    Separation of the third stage from the second

  4. T+4 min 43 s

    Fairing Separation

    Separation of the payload fairing

  5. T+7 min 10 s

    Kick Stage Separation

    Separation of the kick stage from the previous stage

  6. T+8 min

    Kick Stage Burn

    The kick stage conducts an engine burn in orbit.

  7. T+53 min

    Kick Stage Burn

    The kick stage conducts an engine burn in orbit.

  8. T+57 min

    Payload Separation

    Final deployment of the payload from the rocket

  9. T+1 h 46 min

    Kick Stage Burn

    The kick stage conducts an engine burn in orbit.

Slip history

Changes recorded by Space Right Now

No changes since we started tracking on .

    Source updates from Launch Library 2 (13)

    Announcements supplied by LL2 may predate our tracking. They are separate from changes observed by Space Right Now.

    1. LL2 update

      Spacecraft confirmed operational.

      Read the source update
    2. LL2 update

      Biomass deployed.

      Read the source update
    3. LL2 update

      Liftoff

      Read the source update
    4. LL2 update

      Tweaked T-0.

      Read the source update
    5. LL2 update

      Official Webcast by arianespace has started

      Read the source update
    6. LL2 update

      GO for launch.

      Read the source update
    7. LL2 update

      NET early April.

      Read the source update
    8. LL2 update

      Targeting March 2025

      Read the source update
    9. LL2 update

      Launcher swapped with one for Sentinel-2C in summer 2023.

      Read the source update
    10. LL2 update

      NET Q2 2024.

      Read the source update
    11. LL2 update

      NET April 2024

      Read the source update
    12. LL2 update

      NET 2024

      Read the source update
    13. LL2 update

      NET 2024

      Read the source update

    Launch pad

    Ariane Launch Area 1 (ELV)

    Guiana Space Centre, French Guiana (GF)

    Coordinates: 5.236, -52.775

    View launch pad on a map
    Launch data: The Space Devs (Launch Library 2)

    Launch plans change. Times are estimates from the source, not a guarantee of liftoff.