
Launch-site file imagery: Peregrine Mission One, 8 January 2024. Space Launch Complex 41 during a Vulcan launch.
Credit: NASA/Kim Shiflett · Public domain (NASA) · SourceUSSF-106
Vulcan VC4S, United Launch Alliance
T-0
Wed 13 Aug 2025, 02:56 CEST
00:56 UTC
Launched successfully
Time known to the minute
We last checked
- Window opens
- Window closes
The mission
A Vulcan VC4S launched USSF-106 to geosynchronous orbit from Cape Canaveral, Florida.
USSF-106 is a mission for the United States Space Force. The launch will deploy various payloads directly into geosynchronous orbit, including the NTS-3 (Navigation Technology Satellite 3), a demonstration navigation satellite testing a new digital signal generator that can be reprogrammed on-orbit to broadcast new signals, improve performance by avoiding and defeating interference, and adding signatures for detecting spoofing attacks.
- Mission type
- Government/Top Secret
Launch timeline
Times are relative to liftoff.
- T-4.9 s
Ignition
Start of the engine ignition sequence
- T+1.1 s
Liftoff
First upwards movement of the rocket
- T+46.1 s
Supersonic
Vehicle is supersonic
- T+1 min 0.1 s
Max-Q
Maximum dynamic pressure
- T+1 min 36.2 s
SRB Separation
The solid rocket boosters are separated from the launcher.
- T+4 min 57.6 s
MECO
Cut-off of the main engine
- T+5 min 3.7 s
Stage 2 Separation
Separation of the second stage from the first
- T+5 min 13.6 s
SES-1
First start of the second engine
- T+5 min 21.7 s
Fairing Separation
Separation of the payload fairing
Rocket
Vulcan VC4S
- Expendable
- 2 launches so far
- Family
- Vulcan
- Manufacturer
- United Launch Alliance
Launch site
Space Launch Complex 41
Cape Canaveral SFS, FL, USA
28.58° N, 80.58° W
Open in mapsHow we know
The data on this page comes from Launch Library 2.
We last checked . We check Launch Library 2 about every ten minutes.
Launch Library 2 last changed this launch .
“Time known to the minute” means Launch Library 2 gives the launch time to the minute. How to read launch times
Related launches follow the listed dates, which can change.
Our records start in April 2025 and count orbital launches that have flown.
Every change and update (20)
We started following this launch on .
- Launch Library 2 update
Launch success.
Read the source update - Launch Library 2 update
Liftoff.
Read the source update - Launch Library 2 update
New T-0.
Read the source update - Launch Library 2 update
Updated launch weather, 80% GO.
Read the source update - Launch Library 2 update
Refined launch window.
Read the source update - Launch Library 2 update
Updated launch weather, 75% GO.
Read the source update - Launch Library 2 update
Targeting August 12.
Read the source update - Launch Library 2 update
Delayed to NET August 11 UTC.
Read the source update - Launch Library 2 update
NET August 9 UTC, to be confirmed.
Read the source update - Launch Library 2 update
NET August.
Read the source update - Launch Library 2 update
NET July.
Read the source update - Launch Library 2 update
NET Q2 2025.
Read the source update - Launch Library 2 update
NET early 2025.
Read the source update - Launch Library 2 update
NET Q4 2024.
Read the source update - Launch Library 2 update
NET late 2024.
Read the source update - Launch Library 2 update
Reportedly targeting October
Read the source update - Launch Library 2 update
NET late 2024.
Read the source update - Launch Library 2 update
NET summer 2024, pending Vulcan Cert-2 status.
Read the source update - Launch Library 2 update
Mid to late 2023
Read the source update - Launch Library 2 update
Pushing to Q2 FY23
Read the source update